Start Free Subscription

Case Studies

ecoCMS track record and examples from the field

ecoCMS has a track record of installations and fault detection on many major
turbine types - including GE 1.5 MW, Vestas V80 2 MW, Siemens 2.3MW

Vestas V80 2 MW

Siemens 2.3MW

GE 1.5 MW

Main Bearing 


 

ecoCMS vibration analysis

Vibration analysis showing a main bearing fault (blue) and a healthy main bearing from a neighbouring turbine (green)

  

 

 

Romax inspection

Main bearing damage confirmed by Romax inspection

Planet Bearing

 

 

 

 


Romax inspection

Planet bearing inner race damage confirmed by Romax inspection

 

 

 

ecoCMS vibration analysis

Vibration analysis showing a planet bearing fault detected using data from a high-price factory installed CMS (top) and using ecoCMS (bottom)

Related Items

Reducing O&M cost with Predictive Maintenance for Infigen

Case Study

Reducing O&M cost with Predictive Maintenance for Infigen

Infigen Energy, which operates 24 wind farms across the USA and Australia, wanted to reduce O&M costs and to predict maintenance requirements using Romax's expertise.

Find Out More
Supporting Statkraft with Transition Out of Warranty

Case Study

Supporting Statkraft with Transition Out of Warranty

Find out how Europe’s largest renewable energy generator benefited from using Romax InSight's monitoring services during their transition out of warranty, with a view to keeping ma…

Find Out More